NEW

LNG Booster Pump Skid

The LNG Booster Pump Skid is a skid-mounted cryogenic system designed for reliable LNG pressure boosting and transfer at -162°C.
It ensures stable flow, high efficiency, and safe operation in LNG terminals, pipelines, and regasification facilities.
Fully customizable with optional PLC control and engineered for continuous industrial performance.
BluNet is a supplier of cryogenic LNG pump skid systems, providing engineered solutions for LNG transfer, loading, and pressure boosting applications.

The LNG Booster Pump Skid is a skid-mounted cryogenic system designed to increase the pressure of liquefied natural gas (LNG) for transfer and distribution applications.
It is widely used in LNG terminals, regasification plants, pipeline systems, and industrial gas supply facilities where stable LNG pressure and continuous flow are required.
Designed for cryogenic operation at temperatures as low as -162°C, the system ensures safe, reliable, and efficient LNG pressure boosting under demanding operating conditions.
DSW specializes in the engineering and manufacturing of high-quality LNG booster pump skid systems for industrial cryogenic applications.
Each skid integrates a cryogenic pump, insulated piping, valves, instrumentation, and control components into a compact modular structure for easy installation, reliable performance, and simplified maintenance.

LNG booster pump skid for cryogenic LNG pressure boosting at -162°C in industrial LNG terminal applications
LNG Booster Pump Skid designed for reliable cryogenic LNG pressure boosting and seamless integration in LNG terminals and pipelines.

Key Features

  • Designed specifically for LNG pressure boosting applications
  • Skid-mounted integrated structure for fast installation
  • High-efficiency cryogenic pump system
  • Stable pressure increase with low fluctuation
  • Vacuum-insulated piping to reduce thermal loss
  • Continuous operation under -162°C cryogenic conditions
  • Low boil-off gas (BOG) generation
  • Optional PLC automated control system
  • Suitable for LNG terminal and pipeline systems

Technical Specifications

  • Medium: Liquefied Natural Gas (LNG)
  • Operating temperature: -162°C
  • Function: Pressure boosting / transfer
  • Pump type: Cryogenic centrifugal / submerged pump (optional)
  • Design pressure: Project-specific
  • Flow capacity: Custom engineered
  • Skid structure: Carbon steel / stainless steel frame
  • Insulation: Vacuum insulated piping (optional)
  • Control system: Manual / PLC automation (optional)
  • Installation type: Skid-mounted modular system

Manufacturing Standards

  • ASME design code (optional)
  • CE certification requirements
  • Cryogenic equipment manufacturing standards
  • LNG industry safety regulations

Advantages

Stable Pressure Boosting Performance

Ensures consistent LNG pressure increase without flow instability.

Cryogenic Reliability

Designed for continuous operation under extreme low-temperature LNG conditions.

Modular Skid Design

Factory-assembled system reduces installation time and engineering complexity.

High Safety Level

Integrated pressure protection and emergency shutdown compatibility.

Energy Efficient Operation

Optimized pump design reduces energy consumption during boosting process.

Custom Engineering Capability

Fully adaptable to different LNG plant layouts and capacities.

Technical Specifications

Pump Capacity 300 L/min
Pump Speed 5,500 rpm
Maximum LNG Head 320 m
Maximum Discharge Pressure 19 bar
Motor Power 15 kW
Dimensions (L×W×H) 3000 × 2438 × 2600 mm

Applications

  • LNG receiving terminals
  • LNG regasification plants
  • LNG pipeline transmission systems
  • Peak shaving facilities
  • LNG distribution hubs
  • Industrial gas supply systems
  • Energy infrastructure projects

Safety Features

  • Overpressure protection system
  • Emergency shutdown (ESD) interface
  • Temperature and pressure monitoring
  • Relief valve system
  • Leak detection integration option

Customization Options

  • Pump capacity and pressure range selection
  • Single or dual pump configuration
  • PLC automation control system integration
  • Skid size and layout design
  • Insulation and piping configuration
  • Instrumentation and monitoring upgrades

Reviews

There are no reviews yet.

Be the first to review “LNG Booster Pump Skid”

Your email address will not be published. Required fields are marked *

Shipping & Delivery

Global Shipping and Delivery

BluNet provides reliable and fully documented global shipping solutions for industrial gas cylinders, cryogenic equipment, and related systems. Our logistics services are designed specifically for B2B international trade, ensuring secure, compliant, and efficient delivery to your designated facility or project site.

Estimated transit times are based on standard international sea freight schedules and do not include production lead time, export documentation processing, customs clearance, or local delivery arrangements. Actual delivery times may vary depending on destination, order quantity, carrier availability, port conditions, and customs procedures.

  • Europe: 25 – 40 days via sea freight
  • North America: 25 – 40 days via sea freight
  • Asia: 7 – 15 days via sea freight
  • Middle East & Africa: 20 – 35 days via sea freight
  • Australia: 20 – 35 days via sea freight

Due to international transportation regulations for pressure vessels and industrial gases, BluNet primarily arranges shipments via sea freight.

We support international trade terms including EXW, FOB, CIF, CFR, DAP, and DDP, depending on your procurement and logistics requirements.

Unless otherwise agreed in writing, import duties, taxes, customs clearance charges, and destination handling fees are the responsibility of the buyer. BluNet will provide the required export and shipping documentation, including commercial invoice, packing list, bill of lading, certificate of origin, and product certifications if required.

Shipment tracking information will be provided once the goods are dispatched, allowing full visibility of the shipment throughout transit.

Returns & Refunds

At BluNet, we are committed to supporting our international partners with reliable products and professional service. In the event of product discrepancies or shipment damage, our structured return and replacement process helps minimize disruption to your operations.

Return Guidelines:

  • Return requests must be submitted within 14 days of product receipt.
  • Products must remain unused and in their original packaging unless the issue involves manufacturing defects or shipping damage.
  • Damaged or defective items must be documented with photographs and relevant shipping documents.
  • Custom-made, pressure-certified, or specially configured products may not be eligible for return unless confirmed as defective.

Once a return request is reviewed and approved, BluNet may provide replacements, credit notes, or refunds according to the agreed trade terms and order conditions. Refunds are processed through the original payment method or applied toward future orders where applicable.

Please note that freight charges, customs duties, taxes, and destination handling fees are non-refundable unless the issue is confirmed to result from manufacturing defects or shipment errors caused by BluNet.

For assistance with shipping, export documentation, returns, or order support, please contact our international sales team:

📧 info@gaseschina.com
🌐 www.gaseschina.com

Reviews

There are no reviews yet.

Be the first to review “LNG Booster Pump Skid”

Your email address will not be published. Required fields are marked *